Financial Year | Project Name | Ward | Location | Budget | Status |
---|---|---|---|---|---|
2019/2020 | Cattle cclutch construction at Aiyam | Rumuruti Township | Aiyam | 540,045.00 | Not Commence |
2019/2020 | Construction of hides and skin bandas (Nyahururu slaughter house) (phase 1) | Igwamiti | Nyahururu | 1,419,866.00 | Ongoing |
2019/2020 | Construction of ilpolei slaughter house | Mukogodo West | Ilpolei | 1,420,000.00 | Not Commence |
2019/2020 | Construction of Kianjomo Cattle dip Crutch | Umande | Kalalu | 700,000.00 | Not Commence |
2019/2020 | Dislting of Kanguro waterpan | Thingithu | Thingithu | 1,420,000.00 | Completed |
2019/2020 | Drip kits installation across the ward (25 drip kits) | Olmoran | Olmoran | 1,419,866.00 | Not Commence |
2019/2020 | Fencing of Umande Milk Cooperative Centre | Umande | Umande | 1,419,866.00 | Completed |
2019/2020 | Household water pans | Salama | Salama | 1,419,866.00 | Completed |
2019/2020 | Procurement of 100 beehives and their accessories | Salama | Salama | 700,000.00 | Not Commence |
2019/2020 | Rehabilitation of kinamba slaughter house | Githiga | Kinamba | 1,267,485.00 | Not Commence |
2019/2020 | Renovation of rumuruti slaughter house | Rumuruti Township | Rumuruti | 1,184,998.00 | Ongoing |
2019/20 | Scooping of 10 Household Water pans | Nanyuki | 1,420,000.00 | Completed | |
2019/2020 | Scooping of household water pans | Ngobit | Ngobit | 1,420,000.00 | Completed |
2019/2020 | Scooping of household water pans | Tigithi | Kahuko , Nyakiyo village | 1,420,000.00 | Completed |
2019/2020 | Scooping of household water pans | Mukogodo East | Grotan Village | 1,420,000.00 | Completed |
2019/2020 | Scooping of household water pans | Segera | Mukima | 1,420,000.00 | Completed |
2019/2020 | Scoping of Household waterpans | Sosian | 1,420,000.00 | Completed | |
2019/2020 | Water pans at Gituamba | Marmanet | Gituamba | 1,419,866.00 | Completed |
2019/2020 | Cattle clutch construction at Kapkures | Rumuruti Township | Kapkures | 539,033.00 | Not Commence |
2019/2020 | Completion of county headquater | Rumuruti Township | Rumuruti | 9,150,000.00 | Ongoing |
2019/2020 | Completion of fire station | Nanyuki | Nanyuki | 2,500,000.00 | Ongoing |
2019/2020 | Installation of street lights | Thingithu | Old market & Mitumba | 1,800,000.00 | Completed |
2019/2020 | Installation of street lights | Ngobit | Ngobit | 1,800,000.00 | Completed |
2019/2020 | Installation of street lights | Tigithi | Thome Shopping Centre | 1,800,000.00 | Completed |
2019/2020 | Installation of street lights | Nanyuki | Kalalu, Umande | 1,800,000.00 | Completed |
2019/2020 | Installation of street lights | Segera | Naibor | 1,300,000.00 | Completed |
2019/2020 | Installation of street lights | Nanyuki | Kabiru centre and Kenya Fibre area | 1,800,000.00 | Completed |
2019/2020 | Installation of street lights | Githiga | Chief office at Mastore area | 1,800,000.00 | Completed |
2019/2020 | Public Toilet at Police post at Naibor STU | Segera | Naibor | 500,000.00 | Ongoing |
2019/2020 | Solar Street Lights | Marmanet | Maili saba, Muhotetu, Thigio | 1,800,000.00 | Completed |
2019/2020 | Solar Street Lights | Rumuruti Township | Ngomongo | 1,800,000.00 | Completed |
2019/2020 | Solar Street Lights | Sosian | Survey and Posta | 1,800,000.00 | Completed |
2019/2020 | Solar Streetlights | Olmoran | Sipili and Olmoran | 1,800,000.00 | Completed |
2019/2020 | Street light at Kiwanja ndege center | Mukogodo East | Kiwanja Ndege | 1,800,000.00 | Completed |
2019/2020 | Street lighting at Kimanjo Center | Mukogodo West | Kimanjo | 1,800,000.00 | Completed |
2019/2020 | Street lights | Igwamiti | Co-ste, Mamboleo, Behind Charity hospital | 1,800,000.00 | Completed |
2019/2020 | Street lights at Pesi center | Salama | Pesi | 1,800,000.00 | Completed |
2019/2020 | Ward Office | Ngobit | Ngobit | 23,333,333.00 | Not Commence |
2019/2020 | Ward office | Segera | Segera | 2,333,333.00 | Not Commence |
2019/2020 | Ward office at Sosian | Sosian | Sosian | 2,333,333.00 | Ongoing |
2019/2020 | Construction of Bungoma ECDE classroom and installation of rain harvesting facilities | Thingithu | Bungoma ECDE | 1,485,000.00 | Completed |
2019/2020 | Construction of ECDE classroom and installation of rain harvesting facilities | Marmanet | Kiriti | 1,485,000.00 | Completed |
2019/2020 | Construction of Gatutura ECDE class | Sosian | Gatundura | 1,485.00 | Ongoing |
2019/2020 | Construction of Kanga A ECDE classroom and installation of rain harvesting facilities | Igwamiti | Igwamiti | 1,485,000.00 | Ongoing |
2019/2020 | Construction of Lechugu ECDE classroom and installation of rain harvesting facilities | Tigithi | Tigithi | 1,485,000.00 | Completed |
2019/2020 | Construction of Marura ECDE classroom and installation of rain harvesting facilities | Salama | Salama | 1,485,000.00 | Completed |
2019/2020 | Construction of Milimani ECDE classroom and rain harvesting facilities | Umande | Umande | 1,485,000.00 | Ongoing |
2019/2020 | Construction of Mithiga ECDE classroom and installation of rain harvesting facilities | Githiga | Githiga | 1,485,000.00 | Ongoing |
2019/2020 | Construction of Mt. Kenya ECDE classroom and rain harvesting facilities | Nanyuki | 1,485,000.00 | Completed | |
2019/2020 | Construction of Mukima ECDE classroom and installation of rain harvesting facilities | Segera | Mukima | 1,485,000.00 | Ongoing |
2019/2020 | Construction of Muramati Bridge | Segera | Muramati | 12,000,000.00 | Ongoing |
2019/2020 | Construction of Ngobit ECDE classroom and rain harvesting facilities | Ngobit | Ngobit | 1,485,000.00 | Ongoing |
2019/2020 | Construction of one motor vihicle workshop | Igwamiti | Nyahururu VTC | 6,500,000.00 | Ongoing |
2019/2020 | Construction of one Workshop and toilet block | Marmanet | Muhotetu VTC | 3,000,000.00 | Ongoing |
2019/2020 | Construction of one Workshop and toilet block | Olmoran | Olmoran VTC | 3,000,000.00 | Ongoing |
2019/2020 | Construction of Seek ECDE classroom and installation of rain harvesting facilities | Mukogodo West | Seek | 1,485,000.00 | Not Commence |
2019/2020 | Construction of Sieku ECDE classroom and installation of rain harvesting facilities | Mukogodo East | Sieku | 1,485,000.00 | Ongoing |
2019/2020 | Construction of Social Hall | Mukogodo East | Doldol | 5,000,000.00 | Ongoing |
2019/2020 | Construction of Social Hall | Mukogodo East | Doldol | 5,000,000.00 | Ongoing |
2019/2020 | Construction of Wangwachi ECDE classroom and installation of rain harvesting facilities | Olmoran | Wangwachi | 1,485,000.00 | Ongoing |
2019/2020 | Constructure of ECDE classroom and installation of rain harvesting facilities | Rumuruti Township | Siriat | 1,485,000.00 | Ongoing |
2019/2020 | Levelling and Fencing of Playing fields | Thingithu | Thingithu | 2,008,147.00 | Ongoing |
2019/2020 | Provision of furniture | Marmanet | Kiriti, Gatirima, Karandi ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of furniture | Rumuruti Township | Kagaa, Siriat nad Mwireri | 345,000.00 | Ongoing |
2019/2020 | Provision of Furniture | Salama | Marura, Mathira, Muruai ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of Furniture's to ECDE's | Segera | Reteti, Dikir, Muramati ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of furniture's to ECDES | Thingithu | Matanya , Bungoma , Sweet waters | 345,000.00 | Ongoing |
2019/2020 | Provision of furniture's to ECDES | Ngobit | Bahati, Kahuruko, Kijabe | 345,000.00 | Ongoing |
2019/2020 | Provision of furniture's to ECDES | Mukogodo West | Seki, Nkiriliti, Kimanjo ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures | Githiga | Kamwenje, Kisima, Nyakinyua | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures | Igwamiti | Karuga, Ewaso Narok, Thama ECDE | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures | Olmoran | Marura and Wangwachi ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of Furnitures to ECDE'S | Sosian | Mathanji, Magadi and Island ECDEs | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures to ECDES | Nanyuki | Muthaiga, Mt. Kenya , St. moses | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures to ECDES | Tigithi | Riacho, Kihato, Lechugu ECDE | 345,000.00 | Ongoing |
2019/2020 | Provision of furnitures to ECDES | Ndemu, Milimani, Kalalu, Nyariginu ECDE | 345,000.00 | Ongoing | |
2019/2020 | Provision of furnitures to ECDES | Mukogodo East | Oloruko, Sieku, Kurikuri ECDEs | 345,000.00 | Ongoing |
2019/2020 | Purchase of Furnitures and water harvesting equipment | Igwamiti | Nyahururu social hall | 625,000.00 | Ongoing |
2019/2020 | Completion of GO-down Section 1 road RMLF- 0.22km | Igwamiti | Nyahururu | 6,590,542.00 | Completed |
2019/2020 | Construction of mikubine masonry tank | Tigithi | Mikubune | 3,000,000.00 | Completed |
2019/2020 | Culvert installation works for manguo roads | Igwamiti | Manguo | 2,162,240.00 | Completed |
2019/2020 | Culverts Installation | Thingithu | Baraka Dispensary, Njoguiini, PCEA Mirera | 1,196,192.00 | Completed |
2019/2020 | Culverts installation works (Area 1) | Marmanet | 2,651,760.00 | Completed | |
2019/2020 | Grading , Gravelling and culvert installation of Niko - Kimei - Josphat Phillipo Road 1Km | Olmoran | 1,774,558.00 | Completed | |
2019/2020 | Grading and Gravelling of Gituamba Road (Ol- Ng'arua - Syria) | Marmanet | 1,720,628.00 | Completed | |
2019/2020 | Grading and Gravelling of kabati-munene mahiga road | Olmoran | 3,986,920.00 | Completed | |
2019/2020 | Grading and Gravelling of Kamau 71 (kwa Ng'ang'a- tarmac ) Road | Marmanet | 3,877,370.00 | Completed | |
2019/2020 | Grading and Gravelling of Kamau 71 - Gatirima Dam road | Marmanet | 3,923,700.00 | Completed | |
2019/2020 | Grading and Gravelling of Kauka - Mama Magu and Mama Dave | Olmoran | 3,692,520.00 | Completed | |
2019/2020 | Grading and Gravelling of Tarmac - Kaptano Road | Marmanet | 2,864,040.00 | Completed | |
2019/2020 | Grading and Gravelling of Thigio- kaptono road | Marmanet | 1,999,144.00 | Completed | |
2019/2020 | Grading and Gravelling of Urumwe road (Mama Njai - Mama Nyaga) | Marmanet | 2,364,544.00 | Completed | |
2019/2020 | Grading and Gravelling of wahome ndoria- munene mahiga road | Olmoran | 2,949,392.00 | Completed | |
2019/2020 | Grading and gravelling works at location to cemetry road | Rumuruti Township | 3,824,586.00 | Completed | |
2019/2020 | Grading of Mbogoini - Sipili Road | Olmoran | 1,000,697.00 | Completed | |
2019/2020 | Grading, gravelling and culvert installation at mastore and miteta shopping centres | Githiga | 2,084,880.00 | Completed | |
2019/2020 | Grading, Gravelling and Culvert installation Muraya Road | Ngobit | Ngobit | 2,488,200.00 | Completed |
2019/2020 | Grading, gravelling and culvert installation of mukima boys road towards kariunga | Segera | Mukima | 3,979,670.00 | Completed |
2019/2020 | Grading, gravelling and Installation of culverts on forester to Kenya fiber road | Nanyuki | Kenya Fiber | 3,618,620.00 | Completed |
2019/2020 | Grading, gravelling of Blue gum - Majengo road | Thingithu | Thingithu | 3,219,812.00 | Completed |
2019/2020 | Grading, gravelling of Container Road | Thingithu | 3,898,296.00 | Completed | |
2019/2020 | Grading, gravelling of Githehu- eveready road | Nanyuki | 3,858,740.00 | Completed | |
2019/2020 | Grading, gravelling of Ilmotiok Ewaso - Naiperere | Mukogodo West | 3,885,420.00 | Completed | |
2019/2020 | Grading, gravelling of Jua kali - Enai road | Segera | 3,868,005.00 | Completed | |
2019/2020 | Grading, gravelling of Kanyoni Village roads | Nanyuki | Kanyoni | 2,910,000.00 | Completed |
2019/2020 | Grading, gravelling of Karachi Full Gospel - silent road | Umande | Kalalu | 2,219,390.00 | Completed |
2019/2020 | Grading, gravelling of Kianjomo, Mithamo- Gakeu Catholic road | Umande | Kalalu | 2,221,860.00 | Completed |
2019/2020 | Grading, gravelling of Kilimo Road | Thingithu | 3,204,500.00 | Completed | |
2019/2020 | Grading, gravelling of Kimanjo - Ilmotiok road | Mukogodo West | 3,996,200.00 | Completed | |
2019/2020 | Grading, gravelling of Kongoni- World vision road | Umande | Kalalu | 2,097,918.00 | Completed |
2019/2020 | Grading, gravelling of Kwa manyara to kirethi to thome shopping centre road | Tigithi | Tigithi | 3,959,929.00 | Completed |
2019/2020 | Grading, gravelling of Kwamberia - catholic church - kiamburi road | Tigithi | Tigithi | 3,895,929.00 | Completed |
2019/2020 | Grading, gravelling of Lailagwan Kariunga primary to nanyuki river road | Segera | 1,988,298.00 | Completed | |
2019/2020 | Grading, gravelling of Likii - Kirihiri road | Nanyuki | Likii | 3,042,448.00 | Completed |
2019/2020 | Grading, gravelling of Ma. Ngichu - Blue Gum | Thingithu | 3,481,583.00 | Completed | |
2019/2020 | Grading, gravelling of Mama Njeru and Angrican Road | Nanyuki | 3,246,785.00 | Completed | |
2019/2020 | Grading, gravelling of Matega Road | Thingithu | Thingithu | 3,466,958.00 | Completed |
2019/2020 | Grading, gravelling of Mirera - Baba Kagunda | Thingithu | Mirera | 3,674,027.00 | Completed |
2019/2020 | Grading, gravelling of Ndemu ruai pentecost to AIC church road | Umande | Umande | 1,716,928.00 | Completed |
2019/2020 | Grading, gravelling of Ngoro Theru - Mwiyogo Primary road | Tigithi | Tigithi | 2,998,500.00 | Completed |
2019/2020 | Grading, gravelling of staff road | Nanyuki | 3,464,429.00 | Completed | |
2019/2020 | Grading, gravelling of Thome- Kirethi to tigithi river road | Tigithi | Tigithi | 1,899,314.00 | Completed |
2019/2020 | Gravelling of Ngenia-Rotasha Road RMLF- 3km | Mukogodo East | Ngenia | 6,667,100.00 | Completed |
2019/2020 | ing and Gravelling of Kamau 71- kwa nganga road | Marmanet | 3,252,640.00 | Completed | |
2019/2020 | Instalation of culverts on Likii - Kiambuzi road | Nanyuki | Likii | 2,018,400.00 | Completed |
2019/2020 | Lenana -DC PH 2 RMLF- 0.40km | Nanyuki | Nanyuki | 16,754,077.00 | Completed |
2019/2020 | Munyua Road Additional works RMLF- 0.40km | Igwamiti | Nyahururu | 2,397,140.00 | Completed |
2019/2020 | New market link road (New market road to Mosque) RMLF- 0.08km | Nanyuki | Nanyuki | 4,587,800.00 | Completed |
2019/2020 | Opening of musul to soitoundo to inani road | Mukogodo West | 3,739,840.00 | Completed | |
2019/2020 | Opening of Security Road, grading and gravelling of Astu- Kuki Gallman Road 3Km | Olmoran | 3,913,914.00 | Completed | |
2019/2020 | Opening up of roads- Mastore to Njoroge Gitangari road | Githiga | 3,304,260.00 | Completed | |
2019/2020 | Re - carperting of Macharia Road section 2 RMLF- 0.27km | Igwamiti | Nyahururu | 8,147,202.00 | Completed |
2019/2020 | Rehabilitation of Ibis Road RML - 0.22 km | Nanyuki | Nanyuki | 6,537,760.00 | Completed |
2019/2020 | Road opening, grading and gravelling of matwiku shopping centre roads | Githiga | 3,838,098.00 | Completed | |
2019/2020 | Road opening, grading and gravelling of matwiku to njoroge gitangari road | Githiga | 3,637,644.00 | Completed | |
2019/2020 | Road opening, grading of waweru gathua plots roads, new cereal board, stadium and kinamba cemety roa | Githiga | 1,938,360.00 | Completed | |
2019/2020 | Tarmacking old market road RMLF -0.38 km | Nanyuki | Nanyuki | 16,420,194.00 | Completed |
2019/2020 | Tarmacking Sagana road RMLF -0.20 km | Nanyuki | Nanyuki | 10,956,200.00 | Completed |
2019/2020 | Upgrading of C77-Bishop Luis school - Koinange Street Junction road RMLF- 0.40km | Igwamiti | Nyahururu | 21,599,464.00 | Ongoing |
2019/2020 | Upgrading of C77-Liberty Petrol station - Nyaki Hotel - Aghakan Walk Hospital road RMLF- 0.27km | Igwamiti | Nyahururu | 17,931,761.00 | Completed |
2019/2020 | 200 persons Septic tank | Rumuruti Township | Sipili Market | 1,890,000.00 | Ongoing |
2019/2020 | Ablution block at castle | Tigithi | Castle | 1,600,000.00 | Ongoing |
2019/2020 | Ablution block at salama centre | Salama | Salama | 1,000,000.00 | Ongoing |
2019/2020 | Ablution block at umande market | Umande | Umande | 1,200,000.00 | Ongoing |
2019/2020 | Ablution block in Kundallila centre | Igwamiti | Kundallila | 1,309,346.00 | Ongoing |
2019/2020 | Ablution block Kinamba Market | Githiga | Kinamba | 2,000,000.00 | Ongoing |
2019/2020 | Abtution block Mutanga market and Oljabet Auction | Marmanet | Mutanga and Oljabet | 1,000,000.00 | Ongoing |
2019/2020 | Boda Boda Sheds at Ndurumo, Simotwo, African Location, OlaLenyiro market, Mutamaiyo, Rumuruti | Rumuruti Township | 2,600,000.00 | Ongoing | |
2019/2020 | Bodaboda shed at K.D.S.P stage and thome centre | Tigithi | Tigithi , Thome | 700,000.00 | Completed |
2019/2020 | Completion of phase II of nyahururu market shade | Igwamiti | Nyahururu | 2,000,000.00 | Ongoing |
2019/2020 | Completion works at arjiju resource cetre | Mukogodo East | Arjiju | 1,895,056.00 | Ongoing |
2019/2020 | Construction Ablution block at Kiwanja ndege | Mukogodo East | Kiwanja Ndege | 1,000,000.00 | Ongoing |
2019/2020 | Construction of ablution block at Kabage market | Marmanet | Kabage | 1,000,000.00 | Ongoing |
2019/2020 | Construction of Auction yard at karaba market | Marmanet | Karaba | 700,000.00 | Ongoing |
2019/2020 | Construction of Boda Boda shade | Mukogodo West | Rancher, Musul centre | 600,000.00 | Ongoing |
2019/2020 | Construction of Boda boda shed | Nanyuki | Muthaiga | 400,000.00 | Ongoing |
2019/2020 | Construction of Boda boda shed | Nanyuki | Kabiru Centre | 400,000.00 | Ongoing |
2019/2020 | Construction of Boda boda shed | Nanyuki | Likii | 400,000.00 | Ongoing |
2019/2020 | Construction of Boda boda shed | Nanyuki | Nturukuma | 400,000.00 | Ongoing |
2019/2020 | Construction of Boda boda shed | Nanyuki | Asian Quarter | 400,000.00 | Ongoing |
2019/2020 | Construction of boda boda sheds | Ngobit | Kahuruko, Kariguini, Muhonia and bahati | 1,500,000.00 | Ongoing |
2019/2020 | Construction of Bodaboda shade | Thingithu | Makutano | 500,000.00 | Completed |
2019/2020 | Construction of Bodaboda shade | Segera | Ndikiri & Endana | 600,000.00 | Ongoing |
2019/2020 | Construction of Ndikiri Ablution block | Segera | Ndikiri | 1,000,000.00 | Ongoing |
2019/2020 | Construction of Ndikiri Market stalls | Segera | Ndikiri | 2,000,000.00 | Ongoing |
2019/2020 | Construction of vendor boxes at rumuruti market | Rumuruti Township | Rumuruti | 2,400,000.00 | Ongoing |
2019/2020 | Drainage and gravelling works at Nanyuki - Mutumba Market | Thingithu | Mitumba Market | 4,000,000.00 | Completed |
2019/2020 | Fencing of kalalu play ground | Umande | Kalalu | 1,000,000.00 | Completed |
2019/2020 | Fencing of Lamuria jua kali shade | Tigithi | Lamuria | 2,900,000.00 | Completed |
2019/2020 | Fencing of Lekiji Market | Segera | Lekiji | 1,700,000.00 | Ongoing |
2019/2020 | Fencing of makutano market | Ngobit | Makutano | 3,800,000.00 | Ongoing |
2019/2020 | Fencing of solio community conservancy phase II | Tigithi | Solio | 1,000,000.00 | Ongoing |
2019/2020 | Fencing works at Lonyek market | Sosian | Lonyek | 5,000,000.00 | Ongoing |
2019/2020 | Kahuruko Kiosks | Olmoran | Kahuruko | 1,500,000.00 | Ongoing |
2019/2020 | Karandi boda boda shade | Marmanet | Karandi | 300,000.00 | Ongoing |
2019/2020 | Maili nane Bodaboda sheds | Marmanet | Maili nane | 300,000.00 | Not Commence |
2019/2020 | Marikiti Old Market | Thingithu | Old market | 3,500,000.00 | Completed |
2019/2020 | Murraming of Gatundia market | Marmanet | Gatundia | 1,000,000.00 | Ongoing |
2019/2020 | Olkingei ablution block | Mukogodo East | Olkingei | 1,000,000.00 | Ongoing |
2019/2020 | Overhang at kalalu market | Umande | Kalalu | 1,500,000.00 | Completed |
2019/2020 | Rehabilitation of ilng'wesi community lodge | Mukogodo East | Ilngewsi | 1,000,000.00 | Ongoing |
2019/2020 | Resource center at tool | Mukogodo West | Tool | 2,400,000.00 | Ongoing |
2019/2020 | Resource centre ngambolo Women Group | Mukogodo West | Ngambolo | 3,000,000.00 | Ongoing |
2019/2020 | Sipili Market stalls | Olmoran | Sipili | 2,500,000.00 | Ongoing |
2019/2020 | Women's resource Centre | Mukogodo East | Olkingei | 2,890,000.00 | Ongoing |
2019/2020 | Borehole equipping at arjiju | Mukogodo East | Arjiju | 2,500,000.00 | Completed |
2019/2020 | Borehole equipping at arjiju | Mukogodo East | Arjiju | 2,500,000.00 | Completed |
2019/2020 | Construction of jikaze masonry tank | Nanyuki | Nanyuki | 2,536,000.00 | Completed |
2019/2020 | Construction of Masonry Storage water Tank | Mukogodo East | Chumvi | 3,800,000.00 | Ongoing |
2019/2020 | Construction of mukuri umoja cattle trough, pipelaying and man hole | Nanyuki | Mukuri | 1,500,000.00 | Completed |
2019/2020 | Construction of nganoini- salama Masonry storage water Tanks | Salama | Salama | 2,500,000.00 | Ongoing |
2019/2020 | Driling of Ndonyo loip Primary school Borehole | Sosian | ndonyoloip | 2,500,000.00 | Completed |
2019/2020 | Drill and Equiping Borehole at Sirat Primary School | Segera | Sirat | 4,000,000.00 | Completed |
2019/2020 | Drill and equipping Yard primary school community borehole | Thingithu | Thingithu | 4,000,000.00 | Pending |
2019/2020 | Drill of Mutamaiyo pry borehole | Rumuruti Township | Mutamaiyo | 4,000,000.00 | Completed |
2019/2020 | Drill of Mutara primary School Borehole | Salama | Mutara | 2,500,000.00 | Completed |
2019/2020 | Drilling and Equipping of Olmunichoi | Mukogodo West | Olmunichoi | 4,000,000.00 | Completed |
2019/2020 | Drilling of Ainapmoi borehole | Rumuruti Township | Ainapmoi | 2,700,000.00 | Completed |
2019/2020 | Drilling of bustani borehole | Githiga | Bustani | 2,500,000.00 | Completed |
2019/2020 | Drilling of Kaharati Borehole | Olmoran | Kaharati | 2,700,000.00 | Completed |
2019/2020 | Drilling of kinamba sosian borehole | Sosian | Sosian | 3,500,000.00 | Ongoing |
2019/2020 | Drilling of Kite borehole | Igwamiti | Kite | 3,000,000.00 | Completed |
2019/2020 | Drilling of limunga- baraka borehole | Marmanet | Munga | 3,000,000.00 | Ongoing |
2019/2020 | Drilling of Mahianyu dispensary borehole | Igwamiti | Mahianyu | 3,000,000.00 | Completed |
2019/2020 | Drilling of majani (mohotetu) borehole | Marmanet | Muhotetu | 3,500,000.00 | Completed |
2019/2020 | Drilling of mbogoini dispensary Borehole | Olmoran | Mbogoini | 4,000,000.00 | Completed |
2019/2020 | Drilling of munyu kanjura borehole | Marmanet | Munyu | 3,000,000.00 | Ongoing |
2019/2020 | Drilling of Ndaragwiti Borehole | Salama | Ndaragwati | 4,000,000.00 | Completed |
2019/2020 | Drilling of Nguo Borehole | Salama | Nguo | 2,000,000.00 | Completed |
2019/2020 | Drilling of Oldigiri borehole | Segera | Oldigiri | 2,500,000.00 | Completed |
2019/2020 | Drilling of Reli B borehole | Thingithu | Reli B | 2,500,000.00 | Completed |
2019/2020 | Equipping of an nyariginu Borehole | Umande | Nyariginu | 2,500,000.00 | Ongoing |
2019/2020 | Equipping of endana Borehole | Segera | Endana | 2,500,000.00 | Completed |
2019/2020 | Equipping of Kaiti borehole | Igwamiti | Kaiti | 3,500,000.00 | Ongoing |
2019/2020 | Equipping of kurum borehole | Mukogodo West | Kurum | 2,500,000.00 | Completed |
2019/2020 | Equipping of mwiyogo primary school borehole | Tigithi | Mwiyogo | 4,000,000.00 | Completed |
2019/2020 | Equipping of Ontulili borehole | Segera | Mukima | 2,500,000.00 | Ongoing |
2019/2020 | Extension of Nganoini Water Project piping and reticulation | Salama | Nganoini | 3,500,000.00 | Completed |
2019/2020 | Grading, gravelling of Equipping of Daiga Primary Borehole | Umande | Umande | 2,500,000.00 | Ongoing |
2019/2020 | Installation of solar system and a tank at Chemu borehole | Marmanet | Chemu | 2,500,000.00 | Completed |
2019/2020 | Iriuko Farmers Water Project (13 HH Pans) | Tigithi | Iriuko | 2,000,000.00 | Completed |
2019/2020 | Kandoro Springs Water Project-tanks and pumping systems | Salama | Kandoro | 2,000,000.00 | Completed |
2019/2020 | Mlimameza Borehole equipping | Olmoran | Mlima meza | 3,500,000.00 | Completed |
2019/2020 | Musul Water Pans (13) | Mukogodo West | Musul | 2,500,000.00 | Completed |
2019/2020 | Nanyuki cemetry ablution block | Nanyuki | Nanyuki | 1,000,000.00 | Completed |
2019/2020 | Nkando Water Project pipes | Nanyuki | Nkando | 1,500,000.00 | Completed |
2019/2020 | Osirwa Water Project pipeline extension | Mukogodo East | Chimvi | 2,000,000.00 | Completed |
2019/2020 | Pipeline extension for Kirima Water project | Salama | Kirima | 2,000,000.00 | Completed |
2019/2020 | Rahabilitation of mukuri water pan | Nanyuki | Mukuri | 500,000.00 | Completed |
2019/2020 | Rahibilitation of kariguini kwa nguyo water pan | Ngobit | Kariguini | 3,000,000.00 | Completed |
2019/2020 | Rehabilitation of Tandare Borehole | Githiga | Tandare | 700,000.00 | Completed |
2019/2020 | Repair and Rehabilitation of Losheki Dam (15000M3) | Mukogodo West | Losheki | 4,000,000.00 | Completed |
2019/2020 | Repair and Servicing of Sipili School of deaf Borehole | Olmoran | Sipili | 700,000.00 | Completed |
2019/2020 | Scooping of 20 water pans | Nanyuki | Nturukuma | 3,000,000.00 | Completed |
2019/2020 | Solar Equiping of Borehole | Rumuruti Township | Machunguru | 2,500,000.00 | Completed |
2019/2020 | Solar Equipping and piping of Nyakinyua borehole | Ngobit | Nyakinyua | 4,000,000.00 | Not Commence |
2019/2020 | Solar Equipping of Murungai Borehole | Umande | Murungai | 2,500,000.00 | Completed |
2019/2020 | Solar Equipping of Tetu Borehole, extend piping to community water points. | Umande | Tetu | 2,500,000.00 | Completed |
2019/2020 | Supply and delivery of pipes and fittings for mackenzie water project | Marmanet | 243,078.00 | Completed | |
2019/2020 | Supply and delivery of pipes for karaba water project | Marmanet | Karaba | 700,000.00 | Completed |
2019/2020 | Supply and pipe lying of Canaan water project | Ngobit | Canaan | 2,400,000.00 | Completed |